Can I read Cost Analysis of NATM vs. Umbrella Arch on EtoBox?
Cost Analysis of NATM vs. Umbrella Arch by fadil is a document available to read on EtoBox.
What is Cost Analysis of NATM vs. Umbrella Arch about?
This conference paper presents a cost comparison between the New Austrian Tunneling Method (NATM) and the Umbrella Arch Method (UAM) used in the Uskudar-Umraniye-Cekmekoy metro project in Istanbul. The study reveals that the construction cost for UAM is significantly higher at €7,305.01 per meter compared to NATM at €3,472.64 per meter, making UAM 2.1 times more expensive. The research emphasizes the importance of selecting the appropriate method based on geological conditions and project requirements.
- Author
- fadil
- Language
- EN