Can I read R 4 Comparison of Gangapath Alignment Change on EtoBox?
R 4 Comparison of Gangapath Alignment Change by suspecious969 is a document available to read on EtoBox.
What is R 4 Comparison of Gangapath Alignment Change about?
The document outlines the revised alignment and specifications for two phases of a road project: Munger - Sultanganj (Phase-I) and Sultanganj - Sabour (Phase-II). It details the lengths of elevated and at-grade sections for both the original tender and the revised alignment, highlighting changes in road lengths and configurations. The revisions result in an increase of 5.594 km of elevated road in Phase-I and 1.432 km in Phase-II, with a total length change of -69m and +100m respectively.
- Author
- suspecious969
- Language
- EN