Skip to content

Opening book details…

About this document

RRM Construction Project Overview by Aniket Salvi is a document available to read on EtoBox.

The document provides a sketch of the location and dimensions of concrete structures to be constructed or reconstructed at a site. A 10m long section of 3m wide concrete is to be constructed running west to east. Reconstruction of a 1.9m section is in progress over 45m. A 10m long 1.9m section is to be constructed running west to east. Reconstruction of a 3m section is in progress for 37m. A 20m long 1.9m section is to be constructed running north. A 20m long 1.9m section and a 47m long 3m section are to be

Author
Aniket Salvi
Language
EN