About this document
OCM Costs in Classroom Repair Project by KIM BIGZ is a document available to read on EtoBox.
This document provides estimates for repair works at Libertad Central School in Misamis Oriental, Philippines. It includes cost estimates for several work items such as providing safety equipment, removing structures, installing doors and frames, ceiling works, and finishing hardware. The largest estimated costs are P242,500 for safety hats/helmets and shoes, P203,935 for ceiling metal frame and fasteners, and P349,072.50 for establishing an occupational safety and health program. Indirect costs such as ove
- Author
- KIM BIGZ
- Language
- EN