Skip to content

Opening book details…

About this document

Control Cable Schedule for Buscupa by Adeel Raza is a document available to read on EtoBox.

This document provides a cable schedule for control cables for a 3x630 MVA power generation station. It lists 9 cables from the Logic Panel Feeder 1 to various locations including the auxiliary transformer, diesel generator control units, voltage regulators, and circuit breakers. It specifies the cable sizes, core details, and quantities needed for each connection. The schedule also outlines 8 cables from Logic Panel Feeder 1 to the bus coupler and mains circuit breaker for voltage and current sensing along

Author
Adeel Raza
Language
EN