Skip to content

Opening book details…

Can I read Advanced TBM for Cairo Metro Line 3 on EtoBox?

Advanced TBM for Cairo Metro Line 3 by ThomasCamus is a document available to read on EtoBox.

What is Advanced TBM for Cairo Metro Line 3 about?

The document summarizes the use of a new tunnel boring machine (TBM) for Phase 2 of the Cairo Metro Line 3 project. Key details: - The 7.2 km tunnel requires a convertible TBM that can operate in both Earth Pressure Balanced and Slurry modes due to complex geology of alternating sand and clay layers. - The 9.47 m diameter TBM has advanced monitoring and is designed for curved tunnels. It uses two continuous service trains to deliver ring segments and remove excavated material. - The TBM is the third to be

Author
ThomasCamus
Language
EN

More by ThomasCamus

Browse all works by ThomasCamus