Skip to content

Opening book details…

About this document

Construction of Incheon Extradosed Bridge by Oanh Phan is a document available to read on EtoBox.

This document summarizes the construction of an extradosed bridge in South Korea. The bridge consists of 3 continuous spans totaling 308 meters. It was constructed from 2005-2009 using cast-in-place free cantilever method. Key aspects discussed include the bridge design with an H-shaped tower, semi-fan cable layout, use of climbing forms for tower construction, and camber control during erection to account for deformation.

Author
Oanh Phan
Language
EN