Opening book details…
Can I read Revised Culvert Crossing Feasibility Report on EtoBox?
Revised Culvert Crossing Feasibility Report by Pallab Jana is a document available to read on EtoBox.
What is Revised Culvert Crossing Feasibility Report about?
The report proposes a revised length for the culvert crossing from 50 meters to a greater distance due to the proximity of a pond, necessitating the use of the Shallow HDD method instead of the open cut method. This change was discussed during a site visit with TEPL on March 8, 2025. Photos of the entry side, drilling line, and exit side are included for reference.
- Author
- Pallab Jana
- Language
- EN