Skip to content

Opening book details…

About this document

Pemeliharaan D.I Kalaena Luwu Timur by Krisan is a document available to read on EtoBox.

This document contains a table listing the volume of earthworks along a road project from station 0+000 to station 2+350. It shows the station number, volume measured in square meters and cubic meters, average volume, distance between stations, total volume, and cumulative volume. The total volume of earthworks along the project is reported as 4,913,550 cubic meters.

Author
Krisan
Language
EN