About this document
Cast Iron Penstock QC Schedule by ABHISHEK SINGH is a document available to read on EtoBox.
The document outlines a quality control schedule for cast iron penstocks. It lists 6 quality control processes: 1) incoming material inspection, 2) in-process machine shop inspection, 3) in-process assembly inspection, 4) in-process testing, 5) final verification in painting, and 6) packing inspection.
- Author
- ABHISHEK SINGH
- Language
- EN