Skip to content

Opening book details…

About this document

Manual Boring for Water Pump Installation by Mohammed Minhaj is a document available to read on EtoBox.

The document provides a job safety analysis for manual boring work to install a water pump. It outlines two main job steps: 1) Mobilizing equipment and materials and 2) Manual excavation and boring. Potential hazards are identified for each step such as unskilled personnel, damaged tools, falls, fires, and more. Hazard controls are also specified such as using trained staff, inspecting tools, wearing PPE, controlling sludge, and stopping work if utilities are exposed. The JSA requires review after job compl

Author
Mohammed Minhaj
Language
EN