Opening book details…
Can I read BoQ Sample on EtoBox?
BoQ Sample by ora is a document available to read on EtoBox.
What is BoQ Sample about?
The document outlines the detailed bill of quantities for the construction of the Ana Uraga Jiratamo River Bridge, including various items such as drainage, earthwork, foundation, and concrete structures. The total cost of the project is calculated to be 31,627,261.57, with an additional 15% VAT bringing the grand total to 36,371,350.81. Each section includes specific quantities, rates, and amounts for different construction activities and materials.
- Author
- ora
- Language
- EN