About this document
November 2021 Production Report Summary by nasir ahmed is a document available to read on EtoBox.
The production report for November 2021 shows that 55 batches were produced and 51 batches were dispatched, with 4 batches still in process. 18 metric tons of material were in the drier day bin. The milling and packing section had no material in the bagging bin, packed 748.275 metric tons of material, dispatched 940.420 metric tons, and had 15.425 metric tons of present stock. Consumption of materials like acid, lime, wood for the boiler, and petcoke are reported. 176.380 metric tons of gypsum were dispatch
- Author
- nasir ahmed
- Language
- EN